Before

After

After_Phase 2

Material/Color Selection for living Interior

Oct.  2012 -  Jan. 2013               Remodeling an Apartment Interior within the Budget | Taipei, Taiwan
                                                   Work Scope:  Construction Surveyor & Design Consultant


House Plan for Additional Bathroom

Jan.  2014 -  Feb. 2014              Negotiation with Owners for House Plan Layout of an Additional Bathroom | Sacramento, CA, USA
                                                  Work Scope:   Design Phase Helper, Drafter for Measuring Drawings of Existing Conditions


Before

On-Site Production Supervision on School's Sidewalk

Oct.  2008 -  Jul. 2009                Alteration of Sidewalks between I-Lan Cultural Center and I-Lan University | I-Lan, Taiwan
                                                   Work Scope:   Project Manager, Construction Surveyor, Design Coordinator


Emily Tai Yung Yi / 510.205.3083 / yungyitai@gmail.com / © 2014 by Yung-Yi Tai.

The  Hostel

Before

After

Zen House

Before

After_Phase 1

Under Construction

After

Design Study from Physical Modeling

Apr.  2008 -  Aug. 2008             House/Housing Volume Fixing and HVAC Study | I-Lan, Taiwan
                                                   Work Scope:   Architectural Designer
, Draftsman


CD of an Overpass

Nov. 2007 - Jan. 2008                Pedestrian Bridge Connects Feng-Shan Temple and Monks’ Dormitory | Hsin-Chu, Taiwan
                                                   Work Scope:   Architect Assistant Designer, Draftsman

Under

Construction